|
GWR Engineering Work - Table of Contents | ||||||||||
|
Table of Contents for GWR Engineering Work, 1928-1938: Introduction 1928 New Goods Facilities at Newport 1928 Caerphilly Locomotive Works 1928 Repairs to Swansea North Dock Drawbridge 1928 Alterations at Cardiff Queen Street Station 1928 Reconstruction and Widening of Aberbeeg Bridge 1928 Oil Gas Works at Newport 1928 New Depot for J.S.Fry & Sons at Ladbroke Grove 1928 Floating Crane for South Wales Docks 1928 Rebuilding the Land Spans of the Royal Albert Bridge 1928 Improvements at Oswestry 1929 New Swing Bridge at Cardiff Docks 1929 Reconstruction of Appleford Viaduct 1929 Removal and Replacement of Lock Gates 1929 Reconstruction of Heronston Lane Underbridge 1929 Reconstruction Work at Old Hill Tunnel 1929 Reconstruction of Holmbush Bridge, near St Austell 1929 Demolition of Wynnstay Colliery Bridge 1929 Improvements at Morpeth Dock Goods Station in Birkenhead 1930 Repairs at Dawlish 1930 New Station Building at Newport 1930 Renewal Work on Crumlin Viaduct 1930 Reconstruction of the Severn Bridge at Worcester 1930 Reconstruction of Goddards Bridge near St Fagans 1930 Reconstruction of Princes Road Overbridge near Ruabon 1931 Reconstruction of the Mill Leat Bridge at Totnes 1930 Cleaning the Roof at Paddington Station 1930 Passing of the Old Dock at Newport 1930 few Level Crossing Barrier at Hayes 1930 Distribution Depot for Cadbury at Exeter 1931 Cementation in the Severn Tunnel 1931 Steel Sleepers 1931 Improvements in the Paignton Area 1931 Viaducts at Quakers Yard 1931 Banbury Marshalling Yards 1931 Platform Extensions at Paddington 1932 Facilities at Brentford Docks 1932 Improvements at Kingswear 1932 Reconstruction of Eign Bridge 1932 Improved Locomotive Accomodation at Didcot 1932 London Lorry Repair Shop 1932 Reconstruction of Traeth Bach Viaduct 1932 Reconstruction of Bridge over the River Towy 1932 Installation of Colour Light Signalling between Paddington and Southall 1932 Reconstruction Work at Taunton 1932 Modernisation of the Wolverhampton Locomotive Works 1933 Replacement of Ponsanooth, Ringwell and Carnon Viaducts 1933 South Wales Docks Improvements 1933 South Wales Marshalling Yards 1933 New Locomotive Running Depots 1933 Improved Rolling Stock Construction and Repair Facillities 1933 Quadrupling the Birmingham Main Line 1933 New Goods Traffic Facilities in the Birmingham Area 1933 Doubling of Lines and Other Improvements in Cornwall 1933 Norton Fitzwarren to Newton Abbot Line Improvements 1933 Didcot to Swindon Line Improvements 1933 Improvements at Trowbridge 1933 Westbury & Frome Avoiding Lines 1933 Improvements on the Minehead Branch 1933 Pier & Harbour Improvements at Weymouth 1933 Fly-over Junction at Cogload 1933 Disinfecting Plant for Railway Rolling Stock 1933 Power Signalling at Cardiff General Station 1934 Dredging the South Wales Docks and Approach Channels 1934 Demolition of a Road Bridge 1934 Reconstruction of Paddington Station 1934 Passing of Brunel's Last Timber Viaduct 1934 New Design of Bridge at Oxford 1934 Improvements at Cardiff 1934 New By-Pass Road at Newport 1934 Improvements at Swansea 1935 Improvements at Bristol Temple Meads Station 1937 Demolition of Penyrheol Viaduct 1937 New Goods Station at Penzance 1938 Movement of Plymouth Signal Box 1938 Construction of New Sea Wall at Penzance 1938 Reconstruction of Oxford Road Bridge in Reading 1938 Automatic Train Control 1938 New Carriage Storage Shed at Swindon 1938 Improvements at Weymouth Quay 1938 Repainting the Royal Albert Bridge 1938 Plymouth (North Road) Station Improvements 1938 Reconstruction of Trenance Viaduct in Newquay 1938 Reconstruction of Leamington Spa Station 1938 Paddington Signal Box Fires |
||||||||||
| --- Copyright 2005-2011 © Tourret Publishing --- | |||||||||||